Project Phases

links to the phases

Phase 1

Phase 1 is to repair the roof.  This phase is now in progress.  

Phase 2A

Phase 2A is the removal of the pews and insalling a new oak floor

Phase 2B

Phase 2B is to re-install the organ and the font in their new positions

Phase 3

Phase 3 is the installation of a much needed loo!

Phase 4

Phase 4 is the installation of a modern heating system

Phase 5

Phase 5 is the installation of a servery